HUSQY570: Holy Roller

Bike builds: 10% fabrication, 10% assembly and 80% waiting for a $5 bag of hardware to show up. That waiting period is dangerous. It's probably the time frame where I acquire most of my new tools and machinery. 
"Wouldn't it be nice to not have to wait 5 biz days for a bag of aluminum spacers? Lets go Craigslist a lathe up, put it on a credit card and let future Dave figure it out."
Some steer bearings, rotor bolts, wheel and caliper spacers later and this font end is finally a roller. 





Next up is some fresh tank mounts.